The following files were intercepted from Backrooms Robotics, and all appear to have relation to The Everything Machine. This file is only to be seen with authority to view the file.
From: Amelia Vane
To: Stretch
Subject: None
5/13/2021
You know as well as I do that I have no reason to send you these things. Yet I do. Why is that?
I'm afraid that is none of your business. As of now, please refrain from making further contact with me. I will be in touch soon.
We both know what'll happen if they find out.With rather cold regards,
Amelia, Head of Backrooms Robotics Project TEM-1
PROJECT PROGRESS
PROJECT NAME: TEM-1
PROJECT ITEM: THE EVERYTHING MACHINE
9/17/2015
Origin: Room 147-C1, next to the power cores.
Updates: Currently residing within storage container high priority A-C. Project TEM-1 is undergoing as expected, and is running smoothly. Testing period will begin shortly. As of now, TEM-1 is incredibly fragile, and should be treated as such. Currently in need of Firesalt, Mana, and The Oracle. May need to get some Ant Canners. Currently missing one Hexcube. Will have to make one manually. Current needed materials need for Hexcube; Spire Steel, Molten Iron, basic steel. Expect inspection period to be on 1/20/2016.
Discovery: Found in a very hidden sector of alpha section B. Originally thought to have been cleared out, now being searched for more instances of machinery of this Level. Filled largely with many unidentified materials, needing very little work done to be fully assembled.
Expected Results: TEM-1 is expected to be capable of fundamentally anything, including a potential escape to The Backrooms themself. TEM-1 has many different sections, however, most of the project is complete. Requesting materials to develop prototype TEM-1.
From: Yellow
To: Amelia Vane
Subject: re: Project Progress
9/18/2020
Very well, the progress is looking good. You can expect all supplies to be delivered by the end of November. Mana may be a small issue, we will look into getting that with Project Mana. In the meantime, I will be reserving a spot in the inspection period for TEM-1, and expect the machine to be inspected on 1/2/2020.
Yellow
From: Amelia Vane
To: Yellow
Subject: re: re: Project Progress
9/18/2020
Very well then, will adjust plans accordingly.
Amelia, Head of Backrooms Robotics Project TEM-1
From: Amelia Vane
To: Yellow
Subject: The Oracle
11/28/2020
As of now, Project TEM-1 is going smoothly. However, in order to power The Everything Core, we will require at least 10 milligrams of The Oracle in order to continue working smoothly. Furthermore, we have yet to receive any Mana from storage. They claim that it isn't shipped in, is this true?
Amelia, Head of Backrooms Robotics Project TEM-1
From: Yellow
To: Amelia Vane
Subject: re: The Oracle
11/28/2020
We would like to see a test log before sending you any samples of The Oracle, in order to ensure production is going smoothly. We are currently someone short of The Oracle, and wish only to devote it to projects which will succeed.
Yellow
From: Amelia Vane
To: Yellow
Subject: re: re: The Oracle
11/29/2020
Very well, testing is underway.
Amelia, Head of Backrooms Robotics Project TEM-1
From: Amelia Vane
To: Yellow
Subject: re: re: re: The Oracle
12/22/2020
1 File Attached
Hello there once more. Currently, sample test have been completed for TEM-1. The results are attached below. If you wish to see more testing, we will do more accordingly.
Amelia, Head of Backrooms Robotics Project TEM-1
PROJECT TEM-1 RESULTS | |
---|---|
Test | Result |
Attempt to make a standard lab rat. | TEM-1 appears to vibrate for a moment, before releasing a single Hexcube. After this, the Hexcube creates a standard white lab rat. |
Attempt to open up an entrance to Level 0 | TEM-1 appears to vibrate for a moment, before stopping vibration, apparently for overheating. |
Attempt to destroy molecules | TEM-1 appears to vibrate for a moment, before completely destroying all atoms within a ham sandwich. There is no trace of the ham sandwich ever existing. |
From: Yellow
To: Amelia Vane
Subject: re: re: re: re: The Oracle
12/25/2020
This project looks like something to invest in. Very well then, The Oracle is being sent. Mana amounts are low, so an approved amount is being sent to you shortly.
Yellow
PROJECT TEM-1B RESULTS | |
---|---|
Test | Result |
Attempt to open a hole to Level 0 | TEM-1 appears to vibrate for a moment, before releasing a Hexcube, then proceeding to create a minor tear in reality. This hole is a direct two way access to Level 0, and is estimated to close within 4-6 days. |
From: Amelia Vane
To: Yellow
Subject: Project TEM-1
12/25/2020
The Project is going splendid, and currently is approaching a state good for inspection period. Since progress has been so fast, we have decided to rename TEM-1 to Prototype TEM-1.
Amelia, Head of Backrooms Robotics Project TEM-1
From: Yellow
To: Amelia Vane
Subject: re: Project TEM-1
12/26/2020
Very well then. Decision approved. Continue work for inspection.
Yellow
From: Amelia Vane
To: Yellow
Subject: Memo
12/25/2020
The gate which led to Level 0 has closed. Noting here. Do you wish for Team TEM-1 to open another one?
Amelia, Head of Backrooms Robotics Project TEM-1
From: Yellow
To: Amelia Vane
Subject: re: Memo
12/26/2020
Send test logs of opening holes to the following Levels:
Level 0
Level 6
Level 4
Level 9Yellow
From: Amelia Vane
To: Yellow
Subject: re: re: Memo
12/31/2020
1 File Attached
Attached are the files of the test log.
Amelia, Head of Backrooms Robotics Project TEM-1
PROJECT TEM-1 RESULTS | |
---|---|
Test | Result |
Attempt to open a hole to Level 0 | TEM-1 shakes for a moment, before releasing a Hexcube which created a tear to Level 0. Hole is estimated to not close until 2023. |
Attempt to open a hole to Level 4 | TEM-1 appears to vibrate for a moment, before releasing a Hexcube which vibrates before opening a hole to Level 4. Hole is estimated to not close until 2041. |
Attempt to open a hole to Level 6 | TEM-1 appears to vibrate for a moment, before releasing a Hexcube which immediately opens a hole to Level 6. Hole is estimated to not close until 2022. Security is to stay vigilant, as Insanities have been exiting through this entry frequently. |
Attempt to open a hole to Level 9 | TEM-1 appears to vibrate for a moment, before releasing a Hexcube which immediately opens a hole to Level 9.1. Hole is estimated to not close until 2023. Security is to stay vigilant, as there has been reports of undocumented Entities. |
From: Yellow
To: Amelia Vane
Subject: re: re: re: Memo
12/31/2020
Test logs look great! Look more into the entrance to Level 9.1 and attempt to troubleshoot the error.
Yellow
From: Amelia Vane
To: Yellow
Subject: re: re: re: re: Memo
1/1/2021
1 File Attached
For unknown reasoning, testing on the entrance to Level 9.1 has been largely uneventful. However, one test log of note has been recorded, done by my head assistant.
Amelia, Head of Backrooms Robotics Project TEM-1
PROJECT TEM-1 RESULTS | |
---|---|
Test | Result |
Attempt to create Almond Water | TEM-1 shakes for a moment, before releasing a Hexcube which created a full bottle of The Oracle. The Oracle has been moved to top security storage, with three armed guards around it at all times, on each entryway. |
From: Yellow
To: Amelia Vane
Subject: Inspection
1/2/2021
Very well then, coming down for inspection shortly.
Yellow
Inspection Log
Current Quality of Machinery
The machine appears to be in high quality, and has no major qualms within it. TEM-1 is performing all expected roles splendidly, and only appears to go off track around 2% of the time.
Current Staff Morale
Staff all appear to be somewhat worn out, but excited due to the prosperity of TEM-1. Filing request for 1 week break. Note: Denied. Currently need all efforts focused on TEM-1.
Future plans?
Currently, no major plans are put in place for TEM-1. However, there have been many prosperities about the potential of an exit to The Backrooms. These rumors have been shut down as of now, however, the theory cannot be denied as of yet.
From: Amelia Vane
To: Yellow
Subject: TEM-1?
1/12/2021
I'm afraid I am incapable of locating TEM-1. Did you take it? There is no trace of it anywhere in high-priority A-C.
Amelia, Head of Backrooms Robotics Project TEM-1
From: Yellow
To: Amelia Vane
Subject: re: Project TEM-1
1/12/2021
A memo will be sent out shortly.
Yellow
SECURITY NOTICE TO ALL STAFF
TEM-1 HAS BEEN STOLEN BY THE SPLINTER
No contact is to be established with The Splinter for any reason. The suspected reasoning for this thievery is to attack The M.E.G. If any members of The Splinter are sighted, they are to be terminated immediately. Failure to do so will result in demotion.
This is not a joke. If any sighting of TEM-1 is found, report to Yellow immediately.
From: Amelia Vane
To: Yellow
Subject: re: re: TEM-1?
1/15/2022
What is this? What do you mean, stolen? It was here just yesterday? The entire building was locked up.
Amelia, Head of Backrooms Robotics Project TEM-1
From: Yellow
To: Amelia Vane
Subject: re: re: re: Project TEM-1
1/15/2020
We are incapable of finding these answers right now. Team recovery is being assembled in an attempt to locate TEM-1.
As of now, all efforts on Project TEM-1 are being postponed, until TEM-1 can be recovered.
Yellow
These messages appear to be pertain to the logs about The Everything Machine, more specifically, the recovery of The Everything Machine. These files are sensitive, and should not be shown to Backrooms Robotics under any circumstances.